Description 7
This project reconfigured an existing residential site owned by the City of Cloverdale and managed by Wallace House as a permanent, affordable housing site. One of the original three buildings was remodeled, and 23 new units were added in a mix of one, two, and three-bedroom homes. The resulting density is 13 units per acre. The project maintains a large riparian setback along Cherry Creek, which meanders through the site. Amenities include a nature path, garden area, playground, sports court, and a common building, along with outdoor rooms between buildings. See the whole site in this short video shot by drone.
In December 2022, The North Bay Business Journal named Cherry Creek Village the best North Bay Affordable Housing Project.
Project Team
Architectural Collaboration with Archilogix
Landscape Architect: Quadriga
Civil Engineer: BKF Engineers
Geotechnical Engineer: RGH Consultants
Structural Engineer: Structural Design Group
Mechanical and Plumbing Engineer: 15000, Inc.
Electrical Engineer: Brokaw Design
Title 24 Consultant: Soldata
General Contractor: GMH Builders
- Date Published: Completed September 2022
- Categories: Multi-Family
- Client: Wallace House/Kingdom Development
- Website: http://wallacehouse.org/